Projects Turkmenbashi / Hazar Balyk 1,100 m³/day SWRO (2014)
Turkmenbashi / Hazar Balyk 1,100 m³/day SWRO (2014)
Water Treatment
Turkmenbashi, Turkmenistan
2014
Completed
1 / 10
Customer
HAZAR BALYK CO.
Capacity
1.100 m³/gün
Location
Turkmenbashi, Turkmenistan
Completion Year
2014
Project Details
Technical Information & Descriptions
Comprehensive information about the project's technical details and technologies used
Project Description
Raw water pump station draws water from Caspian Sea and conveys to pre-filtration system. Sand filtration removes mechanical contamination. Chemical dosing systems provide antiscalant and pH adjustment. Seawater reverse osmosis (SWRO) membrane system removes salts 99.7%. Pure water pump station conveys treated water to storage tanks and distribution network. Operating costs are optimized with energy recovery system. All mechanical equipment and construction works were completed as turnkey. Full automation is provided with modern PLC control system.